
For architecture & interior design studios
We don’t design your project. We make it buildable.
Lobby Mill works as an execution partner to studios: technical design, cost planning, managed production, and installation under one contract. Your design authority stays intact — your detail, built as drawn.
Technical Design
Shop Drawings
DfMA
Buildability Review
Early Contractor Involvement
Design Intent
Technical Submittals
Send us design intent drawings and our technical team develops them for manufacture: shop drawings issued for your approval, buildability review, and construction detailing that respects the original design. We don't redraw your project — we resolve it.
Technical Design
Shop Drawings
DfMA
Buildability Review
Early Contractor Involvement
Design Intent
Technical Submittals
Send us design intent drawings and our technical team develops them for manufacture: shop drawings issued for your approval, buildability review, and construction detailing that respects the original design. We don't redraw your project — we resolve it.
Technical Design
Shop Drawings
DfMA
Buildability Review
Early Contractor Involvement
Design Intent
Technical Submittals
Send us design intent drawings and our technical team develops them for manufacture: shop drawings issued for your approval, buildability review, and construction detailing that respects the original design. We don't redraw your project — we resolve it.
Cost Planning
Quantity Take-Off
Target Cost
Value Engineering
Open Book
Firm Proposals
Provisional Sums
Quantity take-off from your drawings, cost planning against the target, and value engineering that protects design intent: every alternative is presented with its saving and its declared impact on the project. No substitutions behind your back.
Cost Planning
Quantity Take-Off
Target Cost
Value Engineering
Open Book
Firm Proposals
Provisional Sums
Quantity take-off from your drawings, cost planning against the target, and value engineering that protects design intent: every alternative is presented with its saving and its declared impact on the project. No substitutions behind your back.
Cost Planning
Quantity Take-Off
Target Cost
Value Engineering
Open Book
Firm Proposals
Provisional Sums
Quantity take-off from your drawings, cost planning against the target, and value engineering that protects design intent: every alternative is presented with its saving and its declared impact on the project. No substitutions behind your back.
Managed Production
Approved Vendor List
Framework Agreements
Reserved Capacity
Control Samples
Pre-Dispatch Inspection
Paços de Ferreira
Production is executed through an approved vendor list of specialist manufacturers within the Paços de Ferreira furniture cluster, under framework agreements with reserved capacity. Lobby Mill holds the contract, the specification, the quality control, and the warranty.
Managed Production
Approved Vendor List
Framework Agreements
Reserved Capacity
Control Samples
Pre-Dispatch Inspection
Paços de Ferreira
Production is executed through an approved vendor list of specialist manufacturers within the Paços de Ferreira furniture cluster, under framework agreements with reserved capacity. Lobby Mill holds the contract, the specification, the quality control, and the warranty.
Managed Production
Approved Vendor List
Framework Agreements
Reserved Capacity
Control Samples
Pre-Dispatch Inspection
Paços de Ferreira
Production is executed through an approved vendor list of specialist manufacturers within the Paços de Ferreira furniture cluster, under framework agreements with reserved capacity. Lobby Mill holds the contract, the specification, the quality control, and the warranty.
Installation & Handover
Method Statements
Site Supervisor
Site Logistics
Snagging Closeout
Phased Delivery
24-Month DLP
Installation directed and supervised by Lobby Mill: a named site supervisor, a method statement before every intervention, and a snagging list opened and closed by us. A 24-month defects liability period covers execution and installation, alongside our five-year product warranty.
Installation & Handover
Method Statements
Site Supervisor
Site Logistics
Snagging Closeout
Phased Delivery
24-Month DLP
Installation directed and supervised by Lobby Mill: a named site supervisor, a method statement before every intervention, and a snagging list opened and closed by us. A 24-month defects liability period covers execution and installation, alongside our five-year product warranty.
Installation & Handover
Method Statements
Site Supervisor
Site Logistics
Snagging Closeout
Phased Delivery
24-Month DLP
Installation directed and supervised by Lobby Mill: a named site supervisor, a method statement before every intervention, and a snagging list opened and closed by us. A 24-month defects liability period covers execution and installation, alongside our five-year product warranty.





One contract, one point of responsibility, from design intent to handover.
Delivered and installed across Europe. Projects outside Europe are assessed individually, including compliance scope and Incoterms.